Do You Have A Project We Can Help With?
Copperworks, Leeds Project
CalderC.A.D recently undertook a significant road surfacing project in the Copperworks area for our valued client, Brian Rook. The project commenced with a thorough assessment of the existing road conditions, followed by meticulous planning to ensure minimal disruption to the local community and optimal results.
Our team began by preparing the site, which involved clearing debris and grading the surface to establish a solid foundation. Using state-of-the-art machinery and high-quality materials, we laid a robust base layer to enhance durability and longevity. Precision was key as we applied the tar, ensuring an even and smooth distribution across the entire surface. This step was critical to achieving the perfect finish that both us and our client wanted. Throughout the process, we maintained stringent quality control measures, inspecting each phase to ensure it met our high standards. Our skilled workforce, equipped with years of experience and technical expertise, worked efficiently to complete the project on time and within budget.
The result was a flawlessly surfaced road that not only improved accessibility and safety for the industrial estate in Copperworks industrial estate but also enhanced the overall aesthetic appeal.
Project Details
DATE
November, 2023
CLIENT
Brian Rook
LOCATION
Copperworks, Leeds
PROJECT TYPE
Surfacing
VALUE
£235,000
Project Gallery
Before
Final Result
Get In Touch
The CALDER C.A.D. offices are open Monday to Friday from 8.30am to 5.00pm. Please contact us below and we will be in touch as soon as possible.